Clark Electrical was formed in 1952 and has changed and adapted throughout the years to match our varied customer needs.
- March 26, 2025
The scope of this project was to supply and install various outdoor use outlets both single phase and 3 phase. And to also feed a new hut for the Gardner’s use in the form of lighting and a socket outlets.
The supply area was approx 80 metres away at the mains intake.
The project involved excavating a required depth trench the whole length of the route. ( Done by others )
Our cable was run in this trench covered with sand and electrical cable identifying heavy duty PVC tape and then back filled.
At the required area we installed a new IP65 electrical cabinet in which held a fuse board and the required outlets.
From this point we then installed the same fashion range a feed cable to the new gardeners hut. In here we installed a fuse board, lighting and a socket circuit.
All testing and certification supplied.
The works came in on budget and on schedule.